Software Database
Search for resolved Bug or Feature Request:
ID:
Bugfix:
Backport for 1701: If using Pre- Post- Mark jobs toolbar, sometimes e.g. a splitted job ocurred in the Postjob.
Description:
If using Pre- Post- Mark jobs toolbar, sometimes e.g. a splitted job ocurred in the Postjob:
- Even for empty Pre- / Postjobs the whole marking procedure was started before, which lead to different major problems sometimes.
- Pre- / Postjobs could lead to problems before, if any penpath was activated.
Now, activating Pre- /Postjobs, should work more fast than before and should not produce any problem as sometimes before.
State:
solved, bug fixed / feature implemented
Solved in version(s):
REL_3_2_5_20130827_0192 and Stable 3.2.0 with build higher than 0023
3.2.5 and 3.2 (STABLE)
Go to
software changelog